Project Brief
Share intended use, site country, quantity, occupancy, preferred model, delivery target and destination port.
See how Huisheng confirms requirements, commercial terms, production checkpoints, inspection evidence and export handover before your modular building order moves forward.
Each stage has a defined input and approval point. This reduces assumptions, controls changes and gives both teams a shared record of the agreed product and supply scope.
Share intended use, site country, quantity, occupancy, preferred model, delivery target and destination port.
We review layout needs, transport constraints, climate inputs, utilities and items requiring local engineering or approval.
The quotation identifies the proposed configuration, included factory supply, optional items, exclusions and commercial basis.
Confirm floor plan, openings, materials, colours, electrical standard, plumbing points and equipment interfaces.
Buyer and seller details, model, quantity, price, currency, trade terms, payment schedule and delivery basis are checked in writing.
After the agreed initial payment is received, materials and production are scheduled according to the confirmed order documents.
Production follows approved information. Material substitutions or requested changes require written review before implementation.
Finished goods are checked against the agreed scope using factory records, buyer review, remote evidence or third-party inspection as arranged.
Packing, loading plan, marks and agreed export documents are coordinated after commercial and inspection release conditions are met.
Payment milestones vary by product, quantity, customization and delivery arrangement. The signed or formally accepted PI/contract—not a web page—defines the applicable deposit, balance timing, currency and bank details.
Verify legal seller and buyer names, product description, quantity, configuration, unit and total price, currency, Incoterm, destination, lead-time basis and payment milestones.
Use only bank information issued through Huisheng’s confirmed business channel. Treat any unexpected account change as suspicious and verify it independently before payment.
Include the PI or contract number and buyer name in the transfer reference, then send the remittance advice for finance reconciliation.
Production scheduling begins only after the required cleared funds and final approved order information are confirmed in writing.
The schedule depends on the confirmed order. Use only the percentages and due dates written in your Huisheng PI or contract.
Inspection timing and evidence should be agreed before order confirmation. Available methods may include factory records, photos, video, buyer/representative visit or an appointed third party.
Available currencies and banking methods depend on the quotation and receiving-bank arrangement. Confirm them with the sales and finance teams before issuing the PI.
The exact route depends on the selected building system, but the control logic stays consistent: approved inputs, traceable production stages, documented checks, issue closure and shipment release.
Key frame, panel, opening and fit-out materials are checked against the purchasing and production specification.
Cutting, welding, fastening and dimensional work follow the approved structural configuration and production instructions.
Specified preparation, coating or galvanized components are checked for coverage and visible condition.
Floor, roof, wall panels, flashings and seals are installed according to the selected system and approved layout.
Doors, windows, electrical items, plumbing points and optional equipment are installed when included in factory scope.
Specified finishes, fixtures and accessories are completed, protected and prepared for final checks.
Quantity, dimensions, appearance, functions, included accessories, labels and packing readiness are reviewed against the order record.
Corrections are closed, evidence is recorded and the agreed release conditions are completed before loading.
Overall, detail, accessory and packing images aligned with the agreed checklist.
Walk-through evidence for appearance, included items and selected operating checks.
On-site review coordinated with factory safety and production scheduling.
An appointed inspection company can work to a buyer-approved checklist and sampling plan.
Update frequency and milestone evidence should be agreed with the project team. The available record depends on the product and production stage.
Yes. Send the checklist, acceptance criteria, sampling level and required documents before order confirmation so feasibility and responsibility can be agreed.
The issue should be recorded, reviewed against the approved scope and closed with corrective evidence before the relevant release decision.
Share the product, quantity, layout, destination, target schedule and inspection expectations. We will help organize the information needed for a quotation and approval path.
Start Your Project Inquiry →Send the destination, intended use and quantity for a project-specific response.